Jason & Nancy: Phase 2
During Jason & Nancy’s Phase 2 remodel, BGH Construction replaced windows, the front door, and the back patio doors. BGH also removed the barrel ceiling in the entry to create a more modern and inviting foyer that allows for clear views of the home’s best features. In the family room, BGH Construction built a custom floating entertainment wall with built in lighting within the unit. In addition to a powder room remodel, BGH installed a custom built steel railing system with hickory railing cap. Lastly, BGH Construction replaced the existing back deck with composite and added an aluminum cable rail system along with an an area for a sunken hot tub.